Our Projects

Commercial HVAC Installation

  • Hvac
  • Dubai

Grade-A Commercial Tower, Downtown Dubai

Phileo PM supplied and installed the full HVAC system for a 42-floor Grade-A commercial tower in Downtown Dubai, including 80 VRF zones, central AHUs, fan coil units, and complete BMS integration. The project was delivered for a major UAE real-estate developer and required tight coordination with the main contractor's structural and electrical packages on a live programme.

The challenge was scale and pace: the developer required the building to be tenant-ready four weeks earlier than originally programmed. Phileo PM responded with a modular installation plan, pre-fabricated refrigerant manifolds, and a 6-day-a-week site team. The result: handover delivered three weeks ahead of the revised schedule, with measured energy consumption 12% below the design target.

From Site to Handover

Related projects

Can't find what you're looking for? Our technical team will source it.

Reach our technical sales team for product specifications, project quotations, or partnership enquiries.